67 KG Sepatu Industri Infrared Pemanasan Oven Penghematan Energi Dan Kapasitas Tinggi

Shoe making machine
May 23, 2025
Koneksi Kategori: Mesin Pengatur Panas Sepatu
Singkat: Discover the 67 KG Shoe Industrial Infrared Heating Oven, designed for energy-saving and high-capacity shoe gluing and drying. With adjustable temperature (0-150°C) and a deodorizing device, it ensures efficient drying in just 30-45 minutes per batch. Perfect for industrial shoe production!
Fitur Produk Terkait:
  • Designed for gluing and drying shoes with a capacity of 12 pairs per batch.
  • Drying time ranges from 30 to 45 minutes, ensuring quick turnaround.
  • Adjustable temperature settings (0-150°C) to suit different shoe materials.
  • Equipped with a deodorizing device for odor control during drying.
  • Features drying, setting, and deodorizing functions for comprehensive use.
  • User-friendly operation with safety features for hassle-free handling.
  • Energy-efficient design reduces operational costs while maintaining high capability.
  • Ideal for industrial shoe production with consistent and reliable performance.
Pertanyaan:
  • What is the drying time for the 67 KG Shoe Industrial Infrared Heating Oven?
    The drying time is approximately 30-45 minutes per batch, depending on the shoe material and settings.
  • How many pairs of shoes can the oven handle at once?
    The oven can dry up to 12 pairs of shoes per batch, making it suitable for high-capacity industrial use.
  • Is the temperature adjustable for different shoe materials?
    Yes, the temperature is adjustable from 0-150°C, allowing customization based on the shoe material requirements.
Video terkait

YT-178 Slipper strap machine

Shoe making machine
November 27, 2025

Mesin hot stamping label

Shoe making machine
November 20, 2025

Mesin pemasang kancing

Shoe making machine
November 01, 2025

Mesin pengaturan panas vakum

Vacuum heat setting machine
May 17, 2025

video pabrik

Video Lainnya
January 03, 2025

Mesin cetak sepatu

Shoe moulding machine
May 20, 2025

Double-layer assembly line

Shoe production Line
November 16, 2024